You don't have javascript enabled. Good luck with that.
Pencarian
       Hari ini, Uji Kelayakan Terminal Pulogebang Digelar

Pulogebang Terminal Worthiness Test Held Today

The Ministry of Transportation, Toll Road Management Body (BPJT) together with Jakarta Dept. of Transportation will hold worthiness test for Pulogebang Terminal, Monday (6/6). Trial will be also applied for Pulogebang Toll Road which connects terminal with JORR toll road.

Joint personnel from those three teams will inspect the terminal. All will be checked

Jakarta Head Dept. of Transportation, Andri Yansyah, said the worthiness test is applied for the whole terminal areas. It starts from parking lot, emplacement, facilities, in/out access, flyover, and toll gate.

“Joint personnel from those three teams will inspect the terminal. All will be checked,” he said.

Pulogebang Terminal Toll Access Construction Completed

After holding the worthiness test, he added, terminal must be operated lately next week. If it is possible, the operation could be start this week.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye819 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye657 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye590 personAldi Geri Lumban Tobing
  4. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye519 personDessy Suciati
  5. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye512 personAnita Karyati